In September 2018, we delivered and installed the first HST-Screening system for floating material restraint for the city Nanterre in district 92, Paris. It consists of two hydraulically driven HSR-Screen (Total computation length 11.40 m, 4mm bar spacing, 6250 l / s unloading water quantity) with horizontal bars to the direction of flow. Due to…